国产成人精品日本亚洲一二三区|日韩国产中文字幕不卡视频|亚洲欧美日韩国产综合久|国产在线精品福利大全

NewsHome > News > Company news

Significance of continuous slipform paving for bridge deck curb stone slipform paver
release time:2020-3-21 15:33:07      hit count:2183

   With the speeding up of highway construction in China, the paving technology of cement concrete pavement slipform machinery-curbstone slipform paver has been widely promoted and applied, and more and more large, large, medium and small bridges, overpasses, The technical problems of mechanized pavement of single-double-layer reinforced concrete bridge (culvert) surfaces of passages, culverts, and bridgeheads need to be solved through research and engineering practice.

93ab75558c0586a545d12cac6dae8d7.jpg

   Due to the high overall smoothness and durability required of highways, technically, cement concrete pavements, reinforced concrete bridge decks, and reinforced concrete decks at bridge heads are required to achieve continuous paving by curbstone slipform pavers. In order to improve the overall smoothness of the cement concrete pavement, the pavement of extra large, large, medium and small bridges, culverts and passages is paved with curbstone slipform paver when the pavement is slipped. In this way, a high-density, high-flatness bridge deck with the same quality as a slipform paving cement concrete pavement can be obtained. When a motor vehicle runs through these continuously paved bridges (culverts) at high speeds, it is not felt that they are passing through the bridges and culverts, and there is no bumping vibration bumps and no need to decelerate.

   Along the highways in China, due to the large population and dense villages, except for some remote provinces and regions, on average there are more than 3 bridges and culverts and passages per kilometer of highways. If we use the curbstone slipformer for mechanized construction, we can only pave the pavement, and we cannot continuously pave the reinforced concrete bridge deck. The bridge (culvert) surface and the slab are manually constructed, which will inevitably cause slipform machinery that will seriously affect the cement concrete pavement The speed of construction prevents the benefits of large slipform machinery from being fully utilized. On the other hand, the construction quality and overall flatness of the bridge and culvert pavement on the expressway are reduced.

   Objectively, highways, regardless of the cement concrete pavement and reinforced concrete bridge deck, must use curbstone slipform to talk about the pavement mechanized pavement construction technology to ensure its construction quality. Otherwise, the manual construction method will continue to be used. Under such a strong destructive force on the highway, the bridge deck pavement layer cannot be resisted, and serious damage may occur 3 to 5 years after opening to traffic. Currently, rigid bridge deck pavement Repair of the coating is quite difficult.


Previous: Omnidirectional concrete curbstone slipform paver-New curb NC1300
Next: Welcome Minister Xu Donghai and his party to visit our company to inspect and guide our work

Back to list

News you are interested in
商南县| 鹿邑县| 昌图县| 兰州市| 勃利县| 徐汇区| 嫩江县| 阿鲁科尔沁旗| 延吉市| 屏南县| 雷山县| 吉安县| 郴州市| 安岳县| 如东县| 南投市| 华容县| 许昌市| 台北市| 苏尼特右旗| 荆门市| 杭锦后旗| 肇源县| 庄浪县| 永福县| 行唐县| 家居| 南京市| 日土县| 梅河口市| 巴中市| 新化县| 靖宇县| 石楼县| 延边| 汕尾市| 建湖县| 丹棱县| 东丰县| 黑水县| 策勒县|